|
     |
 |
Work as an Employee
 |
United States Air Force
Technical Training Center
92nd APS
Wyoming, PA
Hirani Engineering
Miniola, NY
Paritosh Kumar was on payroll of Hirani Engineering as Senior Architect for a USAF Project - Technical Training Center Revitalization in Wyoming, PA. He is responsible for the Comprehensive Architectural part of the project. He is doing the Building Code Analysis, Fire Code Analysis, complying to all relevant Military Manuals to respond to Air Force Design Guidelines, Anti-Terrorism Guidelines, Sustainability Design, etc. He is coordinating with the Client, Consultants, Manufacturers and Hirani Staff. He is writing the Design Analysis Report, involved with the Design Process and the Construction Documents process. |
|
 |
 |
G.R.V.C. Correctional Facility
Rikers Island, NY
Silver and Ziskind Architects, NY, NY
I was on a Design Team as an Intermediate Architect producing construction drawings. |
|
 |
 |
Goodwill Games Swimming and Diving Complex, East Meadow, NY
Richard Dattner Architect, P.C.
Client: New York State Urban Development Corporation / Dormitory Authority State of New York
Size: 81,200 sq. ft.
Cost: $24,000,000
Date of Completion: 1998
I worked in the capacity of Intermediate Architect on the Design Team for this project. Several of my ideas were used while developing construction documents, producing construction documents and acting as Coordinating Manager, etc. Media used: computer aided design and drafting. |
|
 |
 |
World Trade Center Public Space Egress Study
Proposed Changes
Retail Analysis
Concourse Level
David Elliot Leibowitz Architects, NY, NY
I was on a team to produce presentation drawings. |
|
 |
 |
33rd Precinct Police Station, NY, NY
Richard Dattner Architect, NY, NY
I was part of a design team as Intermediate Architect to produce study model, design and construction drawings. |
|
 |
 |
New School 15
Richard Dattner Architect, P.C. Yonkers, NY
Client: Yonkers Public Schools
Size: 72,000 sq. ft. (500 Pupils)
Construction Cost: $12,000,000
Date of Completion: 1998
I was on design team as Intermediate Architect. Produced construction drawings and coordinated engineering consultants and manufacturer reps.
|
|
 |
 |
New Firehouse Station, The Bronx, NY
Richard Dattner Architect, P.C.
Client: NYC Dept. of Design & Construction
Size: 12,000 sq. ft.
Construction Cost: $3,025,000
Date of Completion: 1999
I was on a design team as an Intermediate architect. Produced Construction drawings and coordinated between engineering consultants and manufacturing reps. |
|
|