|
     |
 |
Work as an Employee
 |
United
States Air Force
Technical Training Center
92nd APS
Wyoming, PA
Hirani
Engineering
Mineola, NY
Paritosh
Kumar was on payroll of Hirani Engineering as Senior Architect
for a USAF Project - Technical Training Center Revitalization
in Wyoming, PA. He is responsible for the Comprehensive Architectural
part of the project. He is doing the Building Code Analysis,
Fire Code Analysis, complying to all relevant Military Manuals
to respond to Air Force Design Guidelines, Anti-Terrorism Guidelines,
Sustainability Design, etc. He is coordinating with the Client,
Consultants, Manufacturers and Hirani Staff. He is writing the
Design Analysis Report, involved with the Design Process and
the Construction Documents process.
|
|
 |
 |
G.R.V.C.
Correctional Facility
Rikers Island, NY
Silver and Ziskind Architects, NY, NY
I
was on a Design Team as an Intermediate Architect producing
construction drawings.
|
|
 |
 |
Goodwill
Games Swimming and Diving Complex, East Meadow,
NY
Richard
Dattner Architect, P.C.
Client:
New York State Urban Development Corporation / Dormitory Authority
State of New York
Size:
81,200 sq. ft.
Cost: $24,000,000
Date of Completion: 1998
I
worked in the capacity of Intermediate Architect on the Design
Team for this project. Several of my ideas were used while developing
construction documents, producing construction documents and
acting as Coordinating Manager, etc. Media used: computer aided
design and drafting.
|
|
 |
 |
World
Trade Center Public Space Egress Study
Proposed
Changes
Retail Analysis
Concourse Level
David
Elliot Leibowitz Architects, NY, NY
I
was on a team to produce presentation drawings.
|
|
 |
 |
33rd
Precinct Police Station, NY, NY
Richard
Dattner Architect, NY, NY
I
was part of a design team as Intermediate Architect to produce
study model, design and construction drawings.
|
|
 |
 |
New
School 15
Richard
Dattner Architect, P.C. Yonkers, NY
Client:
Yonkers Public Schools
Size: 72,000 sq. ft. (500 Pupils)
Construction Cost: $12,000,000
Date of Completion: 1998
I
was on design team as Intermediate Architect. Produced construction
drawings and coordinated engineering consultants and manufacturer
reps.
|
|
 |
 |
New
Firehouse Station, The Bronx, NY
Richard
Dattner Architect, P.C.
Client:
NYC Dept. of Design & Construction
Size: 12,000 sq. ft.
Construction Cost: $3,025,000
Date of Completion: 1999
I
was on a design team as an Intermediate architect. Produced
Construction drawings and coordinated between engineering consultants
and manufacturing reps.
|
|
|